Goals
#

The installation of a PV system to cover the energy needs for hot water preparation. Island operation is not intended.

Initial Situation:
#

Boiler for hot water preparation: warmwasser-waermepumpe-wpa-450

Nominal power consumption ~1KW (heat pump)

Grid access 4KW


Implementation
#

PV Planning:
#

  • Integration into homeassistant
  • 3.5KWp generator capacity
  • Existing open source project to read data from the inverter and integrate it into homeassistant
  • Integration of meter data into homeassistant
  • Microinverter to keep DC voltages in strings low

Components:
#

  • homeassistant in Docker on existing Linux Nextcloud server
  • MQTT server in homeassistant
  • Data on NFS storages
  • Hoymiles Inverter HMS-1600 2x
  • OpenDTU DIAMEX DX-DTU-MAX, Gateway for Hoymiles 1x
  • Mitterbauer AMIS reader 1x
  • JA Solar Solar Module 435W Glass-Glass Full Black Bifacial 8x

Registration with NetzOOE:
#

Since this system exceeds the generator capacity of 800W and is therefore not a balcony power plant, I registered the system with NetzOOE. This can be registered by an electrical engineering specialist who is a market partner with NetzOOE. If grid access is not exceeded, this is a relatively uncomplicated matter.

Reading Meter Data
#

The ability to read the data must be activated by the grid operator. This can be done very easily via the NetzOOE portal.

Setup:
#

  • 3 panels facing south, tilted at 15 degrees, with Hoymiles HMS-1600 on phase 1
  • 3 panels facing west, tilted at 15 degrees, with Hoymiles HMS-1600 on phase 2
  • Installed on the carport for easy work with the test system
  • OpenDTU connected to the inverters reads the values and sends them via WLAN to the MQTT of homeassistant
  • Connect AMIS reader to WLAN and also send values via MQTT
  • Read MQTT in homeassistant
  • Time control of hot water preparation

Initial Data
#

Annual energy consumption chart for the PV system
Annual solar power production chart

Planning Further Expansion
#

  • 4 panels north on the roof 40% on phase 1
  • 4 panels south on the roof 40% on phase 2
  • Use a switch contact to charge the boiler with solar energy
  • Test the setup in the winter months

Since we heat with a tiled stove and stove in the winter months, most of the electrical energy consumption in winter is for hot water preparation.